Chiller or freezer changes everything
A chiller room running at 2 to 5 degrees can often sit on a normal concrete slab, with insulated floor panels or a vinyl finish on top, depending on the use. A freezer room at minus 18 or lower is different. Without floor insulation, cold soaks into the slab and the ground below, moisture in the soil freezes and expands, and over time the floor lifts and cracks. This is called frost heave.
Options for the floor
For freezer rooms in KZN warehouses and butcheries, we normally specify one of these approaches.
- Insulated floor panels laid on a levelled slab, with a wearing surface on top
- Rigid insulation boards under a new reinforced screed
- Heater mats or ventilated pipes below the insulation for large or very cold rooms
- A vapour barrier under the insulation so ground moisture does not migrate up
The right choice depends on room size, temperature, forklift or pallet jack traffic and whether the slab is new or existing.
Traffic and loads
A pallet jack loaded with frozen stock puts a high point load on the floor. Floor panels must be rated for it, and the screed above insulation boards must be thick and reinforced enough. Door thresholds are where floors fail first, so we often add a heated threshold or ramp to stop ice forming at the entrance.
Planning with us
The cheapest time to get the floor right is before the slab work starts. If you are building or moving a cold room in Durban or along the KZN coast, send us the room size, required temperature and how stock moves in and out. We will advise on the floor build-up as part of the cold room design and quote.